APA Citation

Ani, C. (2018). Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production. Institute of Electrical and Electronics Engineers Inc.

Chicago Style Citation

Ani, C. Analysis of the Effective Production Kanban Size With Triggering System for Achieving Just-in-time (JIT) Production. Institute of Electrical and Electronics Engineers Inc, 2018.

MLA Citation

Ani, C. Analysis of the Effective Production Kanban Size With Triggering System for Achieving Just-in-time (JIT) Production. Institute of Electrical and Electronics Engineers Inc, 2018.

Warning: These citations may not always be 100% accurate.