Hoe, H. (2019). An Integrated Model for Adjustment of Process Parameters to Recover Throughput Shortage in Semiconductor Assembly: A Case Study. Universitat Politecnica de Catalunya.
Chicago Style CitationHoe, H.K. An Integrated Model for Adjustment of Process Parameters to Recover Throughput Shortage in Semiconductor Assembly: A Case Study. Universitat Politecnica de Catalunya, 2019.
MLA CitationHoe, H.K. An Integrated Model for Adjustment of Process Parameters to Recover Throughput Shortage in Semiconductor Assembly: A Case Study. Universitat Politecnica de Catalunya, 2019.
Warning: These citations may not always be 100% accurate.