APA Citation

PHUOR , T. (2014). PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD.

Chicago Style Citation

PHUOR , TY. PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD. 2014.

MLA Citation

PHUOR , TY. PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD. 2014.

Warning: These citations may not always be 100% accurate.