Skip to content
UTP Perak Gateway
UTP PerakGateway Information Resource Centre
  • Login
    • Bootstrap
    • Perak
    • English
    • 中文(简体)
    • اللغة العربية
    • தமிழ்
Advanced
  • Channels
  • PRELIMINARY CONSTRUCTION OF RESERVOIR WATER LEVEL CONTROL AT MENGKUANG DAM, PULAU PINANG /
Search for more channels:

Similar Items: PRELIMINARY CONSTRUCTION OF RESERVOIR WATER LEVEL CONTROL AT MENGKUANG DAM, PULAU PINANG /

  • View Record
  • Explore related channels
  • Quick Look
    TILE INSTALLATION AT RESIDENT OF TAMAN SERI SAUJANA, PULAU PINANG /
  • Quick Look
    THE STANDARD PROCEDURE OF PURCHASING DEPARTMENT /
  • Quick Look
    SIJIL PERAKUAN SIAP DAN PEMATUHAN (CCC) /
  • Quick Look
    THE INSTALLATION OF STEEL ROOF /
  • Quick Look
    KERJA-KERJA SUB STRUKTUR DI DALAM PROJEK PERUMAHAN DI CAHAYA ALAM /
  • Quick Look
    KAEDAH PEMBINAAN ASAS JAMBATAN /
  • Quick Look
    Valuing diversity at the interpersonal level
  • Quick Look
    ROAD CONSTRUCTION /
  • Quick Look
    ROOF CONSTRUCTION /
  • Quick Look
    WALL CONSTRUCTION /
  • Quick Look
    QUALITY OF CONSTRUCTION /
  • Quick Look
    CONSTRUCTION OF ROAD /
  • Quick Look
    WALL CONSTRUCTION /
  • Quick Look
    The training of adult middle-level personnel.
  • Quick Look
    THE CONSTRUCTION OF PILE FOUNDATION /
  • Quick Look
    a CONSTRUCTION OF DOME /
  • Quick Look
    THE METHOD OF FLOOR CONSTRUCTION /
  • Quick Look
    THE CONSTRUCTION OF SUB-STRUCTURE /
  • Quick Look
    CONSTRUCTION OF PAD FOOTING /
  • Quick Look
    CAPPING BEAM CONSTRUCTION /
  • Quick Look
    BORED PILE CONSTRUCTION /
  • Quick Look
    WALL CONSTRUCTION: NON LOAD BEARING WALL /
  • Quick Look
    The planning and programming of training at the national level : practices and procedures in developing countries /
  • Quick Look
    PRE-CONTRACT IN CONSTRUCTION PROJECTS /

Author: Muhammad Ikmal Ariff Azmee

  • Show items as search results
  • Explore related channels
  • Quick Look
    PRELIMINARY CONSTRUCTION OF RESERVOIR WATER LEVEL CONTROL AT MENGKUANG DAM, PULAU PINANG /

Author: Nurhasyimah Mohd Zamri

  • Show items as search results
  • Explore related channels
  • Quick Look
    PRELIMINARY CONSTRUCTION OF RESERVOIR WATER LEVEL CONTROL AT MENGKUANG DAM, PULAU PINANG /

UTP Perak Gateway

Enhancing knowledge accessibility for the state of Perak and the nation.

Information Resource Center

Universiti Teknologi PETRONAS

Seri Iskandar, Perak

Tel: 1-300-22-8887 | Enquiries: UCS Portal

Useful Links

  • Home
  • PerakGateway Home
  • UTP Information Resource Centre
  • UTP Knowledge HUB

Our Services

  • Web Design
  • Web Development
  • Product Management
  • Marketing
© Copyright Universiti Teknologi PETRONAS (UTP). All Rights Reserved
Designed by BootstrapMade | DevTools