-
DEFECT IN IBS PROJECT : A CASE STUDY AT PPR TANJUNG PIANDANG, KERIAN, PERAK /
-
CONSERVATION WORKS OF HERITAGE MOSQUES IN GEORGE TOWN, PULAU PINANG /
-
THE ROAD USERS' SATISFACTION TOWARDS THE QUALITY OF ROAD INFRASTRUCTURE IN SERI ISKANDAR /
-
Land reclamation impacts on the coastlines and examples of qualitative assessments /
-
USERS' SATISFACTION TOWARDS THE USAGE OF EXISTING ELEVATOR IN ULU KINTA PGA CAMPUS /
-
Subsidising the Cost of Land for Low Income Housing: Some Evidence from Jos, Nigeria /
-
The Applications Of Active Fire Protection In Museums At Perak /
-
THE SATISFACTION OF ORANG ASLI KAMPUNG SUSU, ULU JELAI, CAMERON HIGHLAND ON THE RESETTLEMENT FACILITIES /
-
REFURBISHMENT WORKS : SHOPPING MALLS IN IPOH, PERAK, MALAYSIA /
-
FIRE SAFETY MANAGEMENT AT DISTRICT HOSPITALS IN PERAK /
-
EFFECTS ABANDONED BUILDING TOWARD THE NEIGHBOURHOOD'S ENVIRONMENT IN GUNUNG RAPAT, KINTA DISTRICT /
-
MAINTENANCE WORKS IN GOVERNMENT QUARTER AT TLDM BASE LUMUT, PERAK BASED ON RESIDENTS' SATISFACTION /
-
ADAPTIVE REUSE OF HERITAGE BUILDINGS IN IPOH OLD TOWN /
-
INVESTIGATION OF MEDIUM COST HOUSING PREFERENCE-FOR YOUNG CITIZEN /
-
THE FLUCTUATION OF HOUSING MATERIAL PRICE IN MALAYSIA /
-
VANDALISM IN CONSTRUCTION SITE /
-
THE INCLUSION OF AUTOCAD SOFTWARE FOR QUANTITY SURVEYING PROGRAMME IN UiTM SRI ISKANDAR, PERAK /
-
ANALYSIS ON THE BENEFITS OF ISO 9001:2000 IMPLEMENTATION MALAYSIAN QUANTITY SURVEYING FIRMS /
-
CLOUD COMPUTING IN CONSTRUCTION MANAGEMENT /
-
SUITABLE EDUCATIONAL BUILDING FOR DISABLED PEOPLE CASE STUDY UiTM /
-
Law Case Analysis of Occupier's Liability in Malaysia Construction Industry /
-
FOREIGN WORKERS PROBLEM FACED BY CONTRACTORS; ATTITUDE /
-
INFLUENCING FACTORS FOR THE BURDEN OF USING IBS TOWARDS CONTRACTORS FOR GOVERNMENT PROJECT IN SELANGOR /
-
THE UTILISATION OF SOLAR ELECTRICAL SYSTEM FOR RESIDENTIAL AREA IN ABNDAR BARU BANGI, SELANGOR /