Time Overrun in Construction Project
Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face h...
Saved in:
| Main Authors: | Othman, I., Shafiq, N., Nuruddin, M.F. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.21863 / |
| Published: |
Institute of Physics Publishing
2018
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85040729418&doi=10.1088%2f1757-899X%2f291%2f1%2f012016&partnerID=40&md5=272315d8f1de01f2dd30b9e80f43180a http://eprints.utp.edu.my/21863/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality planning in Construction Project
by: Othman, I., et al.
Published: (2018) -
Effective Safety Management in Construction Project
by: Othman, I., et al.
Published: (2018) -
Impact of construction waste minimization at construction site: Case study
by: Umar, U.A., et al.
Published: (2016) -
Impact of construction waste minimization at construction site: Case study
by: Umar, U.A., et al.
Published: (2016) -
Influence of water-to-geopolymer solids ratio and curing time on the properties of self-compacting geopolymer concrete
by: Nuruddin, M.F., et al.
Published: (2015)