Semi-quantitative risk assessment on the impact of port development to wellhead platform

An offshore company intends to develop a new field by installing two wellhead platforms to accommodate the well production from this field. Based on port development plans, the locations of these platforms are closed to port dumping and commercial anchorage areas. This can affect the platform's...

Full description

Main Authors: Hermansyah, H., Kumaraningrum, A.R., Sommeng, A.N., Wijanarko, A., Sahlan, M., Shariff, A.M.
Format: Article
Institution: Universiti Teknologi Petronas
Record Id / ISBN-0: utp-eprints.23291 /
Published: John Wiley and Sons Inc. 2020
Online Access: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85076203142&doi=10.1002%2fprs.12117&partnerID=40&md5=4f9505f23fd0eff03a21f84e198880f5
http://eprints.utp.edu.my/23291/
Tags: Add Tag
No Tags, Be the first to tag this record!
id utp-eprints.23291
recordtype eprints
spelling utp-eprints.232912021-08-19T07:26:16Z Semi-quantitative risk assessment on the impact of port development to wellhead platform Hermansyah, H. Kumaraningrum, A.R. Sommeng, A.N. Wijanarko, A. Sahlan, M. Shariff, A.M. An offshore company intends to develop a new field by installing two wellhead platforms to accommodate the well production from this field. Based on port development plans, the locations of these platforms are closed to port dumping and commercial anchorage areas. This can affect the platform's safety. Therefore, risk assessment and mitigation studies are required to forecast the impact of the new wellhead platform project. In this research, a risk analysis was conducted using a semi-quantitative risk analysis method to determine the value of total external risk that affects the safety of platforms and security of personnel. A sensitivity analysis was also conducted to identify the maximum likelihood factors that affect the risk values of platforms. The values for the new platforms were found to high-risk levels. To ensure that the risks are more tolerable, risk mitigation tasks need to be executed. Such tasks should be conducted by the company and related governmental bodies, such that the risk value, can be reduced to medium risk level. The typical risk factor developed in this research can be used by related stakeholders to determine the risk value for the impact of port development on platforms during construction and operation. © 2019 American Institute of Chemical Engineers John Wiley and Sons Inc. 2020 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85076203142&doi=10.1002%2fprs.12117&partnerID=40&md5=4f9505f23fd0eff03a21f84e198880f5 Hermansyah, H. and Kumaraningrum, A.R. and Sommeng, A.N. and Wijanarko, A. and Sahlan, M. and Shariff, A.M. (2020) Semi-quantitative risk assessment on the impact of port development to wellhead platform. Process Safety Progress, 39 (S1). http://eprints.utp.edu.my/23291/
institution Universiti Teknologi Petronas
collection UTP Institutional Repository
description An offshore company intends to develop a new field by installing two wellhead platforms to accommodate the well production from this field. Based on port development plans, the locations of these platforms are closed to port dumping and commercial anchorage areas. This can affect the platform's safety. Therefore, risk assessment and mitigation studies are required to forecast the impact of the new wellhead platform project. In this research, a risk analysis was conducted using a semi-quantitative risk analysis method to determine the value of total external risk that affects the safety of platforms and security of personnel. A sensitivity analysis was also conducted to identify the maximum likelihood factors that affect the risk values of platforms. The values for the new platforms were found to high-risk levels. To ensure that the risks are more tolerable, risk mitigation tasks need to be executed. Such tasks should be conducted by the company and related governmental bodies, such that the risk value, can be reduced to medium risk level. The typical risk factor developed in this research can be used by related stakeholders to determine the risk value for the impact of port development on platforms during construction and operation. © 2019 American Institute of Chemical Engineers
format Article
author Hermansyah, H.
Kumaraningrum, A.R.
Sommeng, A.N.
Wijanarko, A.
Sahlan, M.
Shariff, A.M.
spellingShingle Hermansyah, H.
Kumaraningrum, A.R.
Sommeng, A.N.
Wijanarko, A.
Sahlan, M.
Shariff, A.M.
Semi-quantitative risk assessment on the impact of port development to wellhead platform
author_sort Hermansyah, H.
title Semi-quantitative risk assessment on the impact of port development to wellhead platform
title_short Semi-quantitative risk assessment on the impact of port development to wellhead platform
title_full Semi-quantitative risk assessment on the impact of port development to wellhead platform
title_fullStr Semi-quantitative risk assessment on the impact of port development to wellhead platform
title_full_unstemmed Semi-quantitative risk assessment on the impact of port development to wellhead platform
title_sort semi-quantitative risk assessment on the impact of port development to wellhead platform
publisher John Wiley and Sons Inc.
publishDate 2020
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85076203142&doi=10.1002%2fprs.12117&partnerID=40&md5=4f9505f23fd0eff03a21f84e198880f5
http://eprints.utp.edu.my/23291/
_version_ 1741196652177260544
score 11.62408