Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By red...
| Main Authors: | Khan, J.A., Irawan, S., Seela Thurai, A., Cai, B. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.23826 / |
| Published: |
Elsevier Ltd
2021
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05 http://eprints.utp.edu.my/23826/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!