Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
Saved in:
| Main Authors: | Abdullah, M.S., Alaloul, W.S., Liew, M.S., Musarat, M.A. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.23977 / |
| Published: |
Springer Science and Business Media Deutschland GmbH
2021
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85100735960&doi=10.1007%2f978-981-33-6311-3_67&partnerID=40&md5=1dfa794bfa02c9504bc26e05aac6cfc6 http://eprints.utp.edu.my/23977/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
DEVELOPMENT OF ARTIFICIAL INTELLIGENT PREDICTION MODEL
FOR DELAYS AND COST OVERRUNS DURING THE CONSTRUCTION OF
PALM OIL REFINERY PROJECTS IN MALAYSIA
by: LIM ABDULLAH , MUHAMMAD SANI
Published: (2020) -
Impact of inflation rate on construction projects budget: A review
by: Musarat, M.A., et al.
Published: (2021) -
Inflation rate and labours� wages in construction projects: economic relation investigation
by: Musarat, M.A., et al.
Published: (2021) -
Inflation rate and labours� wages in construction projects: economic relation investigation
by: Musarat, M.A., et al.
Published: (2021)