Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
In spite of the development and innovation in the construction technologies, still, delay and cost overrun are the most crucial challenge of the construction industry in both developed and the developing countries. This research aims to develop a prediction model using Artificial Neural Network (ANN...
Saved in:
| Main Authors: | Abdullah, M.S., Alaloul, W.S., Liew, M.S., Musarat, M.A. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.30313 / |
| Published: |
Springer Science and Business Media Deutschland GmbH
2021
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85100735960&doi=10.1007%2f978-981-33-6311-3_67&partnerID=40&md5=1dfa794bfa02c9504bc26e05aac6cfc6 http://eprints.utp.edu.my/30313/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
DEVELOPMENT OF ARTIFICIAL INTELLIGENT PREDICTION MODEL
FOR DELAYS AND COST OVERRUNS DURING THE CONSTRUCTION OF
PALM OIL REFINERY PROJECTS IN MALAYSIA
by: LIM ABDULLAH , MUHAMMAD SANI
Published: (2020) -
Impact of inflation rate on construction projects budget: A review
by: Musarat, M.A., et al.
Published: (2021) -
Inflation rate and labours� wages in construction projects: economic relation investigation
by: Musarat, M.A., et al.
Published: (2021) -
Inflation rate and labours� wages in construction projects: economic relation investigation
by: Musarat, M.A., et al.
Published: (2021)