The characteristics of coordination process in construction projects

Modern construction projects are no longer confined to a single discipline but are generally multidisciplinary. An independency relationship between a large number of stakeholders required to be managed in construction projects procurement and execution that need continuous coordination. Coordinatio...

Full description

Main Authors: Alaloul, W.S., Liew, M.S., Wan Abdullah Zawawi, N.A.
Format: Conference or Workshop Item
Institution: Universiti Teknologi Petronas
Record Id / ISBN-0: utp-eprints.30734 /
Published: Institute of Electrical and Electronics Engineers Inc. 2015
Online Access: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84962247437&doi=10.1109%2fISTMET.2015.7359021&partnerID=40&md5=770f6aa57331d3498c616ca4617a6ccd
http://eprints.utp.edu.my/30734/
Tags: Add Tag
No Tags, Be the first to tag this record!
id utp-eprints.30734
recordtype eprints
spelling utp-eprints.307342022-03-25T07:16:13Z The characteristics of coordination process in construction projects Alaloul, W.S. Liew, M.S. Wan Abdullah Zawawi, N.A. Modern construction projects are no longer confined to a single discipline but are generally multidisciplinary. An independency relationship between a large number of stakeholders required to be managed in construction projects procurement and execution that need continuous coordination. Coordination function is to harmonize the different activities, so that the determined objectives can be reached effectively. However, the study of coordination characteristics are the way to assess the status of coordination in construction projects. Through the literatures, the most important characteristics of coordination process were identified. Quantitative approach was used to investigate them through questionnaire. The data were analyzed by means of statistical analysis and Chi-square test. The analysis showed that, 45.5 of the respondents mentioned to a moderate level of knowledge about coordination, however 44.6 were commonly applied coordination culture. Nevertheless, about 60 believed that, ability and willingness are the main obstacle of coordination application. At the same time, 75 considered coordination effect as significantly improve the project performance. In the future, 70 of the respondents will always apply coordination consideration from their personal motivation. The results of Chi-square show a significant dependent relationship between the position and organization function variables and the eight coordination characteristics. © 2015 IEEE. Institute of Electrical and Electronics Engineers Inc. 2015 Conference or Workshop Item NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-84962247437&doi=10.1109%2fISTMET.2015.7359021&partnerID=40&md5=770f6aa57331d3498c616ca4617a6ccd Alaloul, W.S. and Liew, M.S. and Wan Abdullah Zawawi, N.A. (2015) The characteristics of coordination process in construction projects. In: UNSPECIFIED. http://eprints.utp.edu.my/30734/
institution Universiti Teknologi Petronas
collection UTP Institutional Repository
description Modern construction projects are no longer confined to a single discipline but are generally multidisciplinary. An independency relationship between a large number of stakeholders required to be managed in construction projects procurement and execution that need continuous coordination. Coordination function is to harmonize the different activities, so that the determined objectives can be reached effectively. However, the study of coordination characteristics are the way to assess the status of coordination in construction projects. Through the literatures, the most important characteristics of coordination process were identified. Quantitative approach was used to investigate them through questionnaire. The data were analyzed by means of statistical analysis and Chi-square test. The analysis showed that, 45.5 of the respondents mentioned to a moderate level of knowledge about coordination, however 44.6 were commonly applied coordination culture. Nevertheless, about 60 believed that, ability and willingness are the main obstacle of coordination application. At the same time, 75 considered coordination effect as significantly improve the project performance. In the future, 70 of the respondents will always apply coordination consideration from their personal motivation. The results of Chi-square show a significant dependent relationship between the position and organization function variables and the eight coordination characteristics. © 2015 IEEE.
format Conference or Workshop Item
author Alaloul, W.S.
Liew, M.S.
Wan Abdullah Zawawi, N.A.
spellingShingle Alaloul, W.S.
Liew, M.S.
Wan Abdullah Zawawi, N.A.
The characteristics of coordination process in construction projects
author_sort Alaloul, W.S.
title The characteristics of coordination process in construction projects
title_short The characteristics of coordination process in construction projects
title_full The characteristics of coordination process in construction projects
title_fullStr The characteristics of coordination process in construction projects
title_full_unstemmed The characteristics of coordination process in construction projects
title_sort characteristics of coordination process in construction projects
publisher Institute of Electrical and Electronics Engineers Inc.
publishDate 2015
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-84962247437&doi=10.1109%2fISTMET.2015.7359021&partnerID=40&md5=770f6aa57331d3498c616ca4617a6ccd
http://eprints.utp.edu.my/30734/
_version_ 1741197458050908160
score 11.62408