A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discip...
Saved in:
| Main Authors: | Ramanathan, C.T., Narayanan, S.P. |
|---|---|
| Format: | Conference or Workshop Item |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.31701 / |
| Published: |
IEEE Computer Society
2014
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988286497&doi=10.1109%2fIEEM.2014.7058680&partnerID=40&md5=12c68465770f1571268ac8774b1494bc http://eprints.utp.edu.my/31701/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Parametric Studies of Triangular TLP
by: Kurian, V.J., et al.
Published: (2008) -
Evaluation of Causes of Delays in Construction Project: Towards Effective Project Management
by: Ahmat, Ummi Amirah Afini
Published: (2018) -
Assessment of Carbon Emission Reduction for Buildings Projects in Malaysia-A Comparative Analysis
by: Klufallah, M.M.A., et al.
Published: (2014) -
Roofing sheets systems for industrial sheds in cyclone prone areas based on dynamic testing
by: Narayanan, S.P., et al.
Published: (2014) -
Roofing sheets systems for industrial sheds for different wind zones based on static load testing
by: Narayanan, S.P., et al.
Published: (2014)