Mathematical matrix method to predict project total cost & schedule
Traditionally the prediction of total project cost and schedule/time followed different methods and was based on the schedule of quantities and labors and on quantity of work and productivity, respectively. The major deficiency of the methods was that the calculations were independent. Change in sch...
Saved in:
| Main Authors: | Ty, P., Potty, N.S., Akram, M.K.M. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.32319 / |
| Published: |
Research India Publications
2014
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84904468065&partnerID=40&md5=61c65f3d1065bd4ae0972ea5bcbfc9a9 http://eprints.utp.edu.my/32319/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF
OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED
MATHEMATICAL MATRLX METHOD
by: PHUOR , TY
Published: (2014) -
Solutions: SPM Mathematics /
by: Lew, K.Y.,
Published: (2014) -
Solutions: SPM Add Math
by: Cheeh, O.M.
Published: (2012) -
STPM Mathematics (T) Term 1 /
by: LC Chin
Published: (2014) -
Matematik SPM
by: M.K.Wong,Dr
Published: (2015)