Fill removal in wellbore using coiled tubing
Coiled Tubing (CT) services are widely applied in oil field to remove fill from wellbore. Its function is to restore the productivity of oil and gas well since fill such as sand will regularly block the production line especially at the well bottom. Predicting the behaviors of cleaning fluid and par...
Saved in:
| Main Authors: | Yong, L.H.P., Pao, W.K.S., Hashim, F.M. |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.32728 / |
| Published: |
2013
|
| Online Access: |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84886257011&doi=10.4028%2fwww.scientific.net%2fAMM.393.863&partnerID=40&md5=d283d217b47f62da65b01fcdf12fbd86 http://eprints.utp.edu.my/32728/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING
by: KHAN, JAVED AKBAR
Published: (2013) -
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing
by: Khan, Javed A, et al.
Published: (2013) -
Effect of different qualities of foam on fill particle transport in horizontal well cleanup operation using coiled tubing
by: Khan, J.A., et al.
Published: (2014) -
Factors affecting fill removal from horizontal well during colied tubing cleanout operation
by: Pao, W.K., et al.
Published: (2014) -
Horizontal Well Cleanup Operation using Foam in Different Coiled Tubing/Annulus Diameter Ratios
by: Khan, Javed, et al.
Published: (2013)