Settlement Analysis due to Micro-Tunnelling Works
Underground sewage system has been designed with a view to modern man’s inclination toward health, hygiene and his aversion to filth and pollutants. Currently there is on-going project at Ipoh, Perak. It is a project to build a sewerage treatment plant and sub-catchment pipeline network across Ip...
| Main Author: | Che Hassan, Nur Muhammad Hadri |
|---|---|
| Format: | Final Year Project |
| Language: | English |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-utpedia.22857 / |
| Published: |
Universiti Teknologi PETRONAS
2017
|
| Subjects: | |
| Online Access: |
http://utpedia.utp.edu.my/22857/1/1.%20Final%20Dissertation_19441.pdf http://utpedia.utp.edu.my/22857/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: |
Underground sewage system has been designed with a view to modern man’s
inclination toward health, hygiene and his aversion to filth and pollutants. Currently
there is on-going project at Ipoh, Perak. It is a project to build a sewerage treatment
plant and sub-catchment pipeline network across Ipoh City. Underground pipe usually
installed using open-trench method but in this project, the pipe was laid down using
trenchless method. Trenchless method involved the use of micro-tunnelling technique.
This disquisition is intended to analyse the longitudinal settlement and transverse
settlement induced by the micro-tunnelling activity of the 1050mm and 1500mm
diameter sewage pipeline at Jalan President Kennedy, Pasir Puteh and Jalan Sri Kinta
1 Ipoh, Perak. A ground level movement were monitor closely using marker placed at
the activity location. |
|---|