DEVELOPMENT AND COST ANALYSIS OF A NEW IBS SYSTEM
Conventional in-situ construction has indeed been one of the most common construction methods till date, and is being adopted in most of the construction projects in Malaysia. Despite its familiarity among designers, contractors and labours, there are many disadvantages of it, including time cons...
Saved in:
| Main Author: | CHIN, KAREN MAY LIN |
|---|---|
| Format: | Final Year Project |
| Language: | English |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-utpedia.22909 / |
| Published: |
Universiti Teknologi PETRONAS
2021
|
| Subjects: | |
| Online Access: |
http://utpedia.utp.edu.my/22909/1/Dissertation_Karen_24527.pdf http://utpedia.utp.edu.my/22909/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of a New Beam System Based on
the Pre-Stressing Concept of Bicycle Wheel
by: Earn, Evon Goh Eu
Published: (2016) -
Developing Thermal Comfort Level Analysis System using
Predicted Mean Vote (PMV) and Building Information Modeling (BIM)
by: Lee, Han Xiang
Published: (2019) -
Life Cycle Cost Analysis of Highway Project
by: Mior Hanapi, Mior Amirul Azam
Published: (2020) -
Life Cycle Cost Analysis of Highway Project
by: Mazuki, Ahmad Izzat Asyraf
Published: (2017) -
Developing Strategies of Integrated Whole System Design Approach for
Energy Efficient Buildings
by: Chan, Yong Yeah
Published: (2021)