Scour and deposition in Pari River after the completion of flood mitigation project /
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | مقال |
| اللغة: | الإنجليزية |
| الموضوعات: | |
| الوسوم: |
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة: Scour and deposition in Pari River after the completion of flood mitigation project /
- Deposition of suspended sediment into porous river beds /
- Effluent control in rivers : uniform emission standards versus river quality objectives /
- Determination of the efficiency of submerged berm in reducing sedimentation into a dredged channel through experimental study /
- Three dimensional parameters visualisation of sediment transport formulae for laboratory fixed bed channels /
- Integrated river management for Malacca state : a conceptual approach /
- Application of GIS on nonpoint source pollution for integrated river basin management /