CONSTRUCTION PLANNING TECHNIQUE : CRITICAL PATH METHOD (CPM) MATURITY AMONG CIDB G7 CONTRACTORS /

Saved in:
Bibliographic Details
Main Authors: Hilmi Jamaludin (Author), Shahela Mamter (Author)
Format: Article
Language:English
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000naa a2200000 i 4500
001 vtls000769974
003 PNM
005 20150528100500.0
008 150508s2013 g b a100 0 eng
015 |a M131-02242 
015 |a IPM2015 
039 9 |a 201505281005  |b sham  |y 201505081635  |z norliar 
049 |a ipm 
090 0 0 |a 692.5  |b QS  |c f  |d M 
100 0 |a Hilmi Jamaludin,  |e author. 
245 1 0 |a CONSTRUCTION PLANNING TECHNIQUE :  |b CRITICAL PATH METHOD (CPM) MATURITY AMONG CIDB G7 CONTRACTORS /  |c Hilmi Jamaludin and Shahela Mamter 
504 |a Bibliography: page 311 
650 1 0 |a Construction projects  |v Congresses 
650 2 0 |a Planning 
700 0 |a Shahela Mamter,  |e author. 
773 0 |7 m2am  |w (PNM)000721098  |a QS Symposium (II : 2013 : Perak)  |t QS SYMPOSIUM SERIES II 2013 : ENHANCING BUILT ENVIRONMENT RESEARCH ENDEAVOR, UNIVERSITI TEKNOLOGI MARA PERAK, 4 JUNE 2013 /  |z 9789675741159  |g pages 308-311 
999 |a VIRTUA40 
999 |a VTLSSORT0080*0150*0151*0490*0900*1000*2450*5040*6500*6501*7000*7730*9992