COST CONTROL DURING CONSTRUCTION STAGE AMONG G6 AND G7 CONTRACTORS /

Saved in:
Bibliographic Details
Main Authors: Muhammad Najib Hakimy Mohd. Yakin (Author), Noor Aishah Mohamad Hamdan (Author)
Format: Article
Language:English
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000naa a2200000 i 4500
001 vtls000808731
003 PNM
005 20171022120900.0
008 160713s2015 my e a000 0 eng
015 |a M151-02299 
039 9 |a 201710221209  |b sham  |c 201607131638  |d sitisuhaida  |y 201607131635  |z sitisuhaida 
040 |a BNM  |b eng  |c BNM  |e rda 
049 |a ipm 
090 0 0 |a 692.5  |b QS  |c f  |d M 
100 0 |a Muhammad Najib Hakimy Mohd. Yakin,  |e author. 
245 1 0 |a COST CONTROL DURING CONSTRUCTION STAGE AMONG G6 AND G7 CONTRACTORS /  |c Muhammad Najib Hakimy Mohd Yakin and Noor Aishah Mohamad Hamdan 
504 |a Bibliography: page 211 
650 1 0 |a Costs, Industrial  |x Research  |v Congresses 
650 2 0 |a Quantity surveying  |v Congresses 
700 0 |a Noor Aishah Mohamad Hamdan,  |e author. 
773 0 |7 m2am  |w (PNM)000778043  |a QS Symposium (VI: 2015 : Perak)  |t QS SYMPOSIUM VI, Universiti Teknologi MARA Perak, Malaysia, 15th May 2015  |z 9789675741319  |g pages 209-211 
999 |a VIRTUA40 
999 |a VTLSSORT0080*0150*0400*0490*0900*1000*2450*5040*6500*6501*7000*7730*9992