Skip to content
VuFind
Login
Theme
Bootstrap
Perak
Language
English
中文(简体)
اللغة العربية
தமிழ்
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Tag
Find
Advanced
CONSTRUCTION METHOD OF TNB SUB...
Cite this
Text this
Email this
Print
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Save to List
Permanent link
CONSTRUCTION METHOD OF TNB SUB-STATION /
Saved in:
Bibliographic Details
Main Authors:
Nur Aadila Rahimin
(Author)
,
Wan Nordiana Wan Ali
(Author)
Format:
Article
Language:
English
Subjects:
Construction industry
>
Research
>
Malaysia
>
Congresses
Occupational training
>
Research
>
Malaysia
>
Congresses
Tags:
Add Tag
No Tags, Be the first to tag this record!
Holdings
Description
Comments
Similar Items
Staff View
Similar Items: CONSTRUCTION METHOD OF TNB SUB-STATION /
Channel Options
View Record
Explore related channels
Quick Look
METHOD STATEMENT FOR CONSTRUCTION OF TNB SUB-STATION /
Quick Look
SUB-STRUCTURE CONSTRUCTION METHOD /
Quick Look
THE CONSTRUCTION OF SUB-STRUCTURE /
Quick Look
COLD-FORMED STEEL TRUSS SYSTEM /
Quick Look
INSTALLATION OF NOVEC 1230 GASSEOUS FIRE SUPPRESSION SYSTEM /
Quick Look
METHOD OF LOCK-UP CONSTRUCTION /
Quick Look
THE METHOD OF FLOOR CONSTRUCTION /
Quick Look
METHOD OF FLOOR SLAB CONSTRUCTION /
Quick Look
THE CONSTRUCTION METHOD OF ROOF STEEL STRUCTURE /
Quick Look
CONSTRUCTION OF PAD FOOTING /
Quick Look
PROSIDING KOLOKIUM LATIHAN PRAKTIKAL.
Quick Look
THE SAFETY INSPECTION ON A CONSTRUCTION SITE/
Quick Look
THE METHOD OF CONSTRUCTION TO BUILD ROOF TRUSSES /
Quick Look
Prosiding Kolokium Latihan Praktikal.
Quick Look
PROSIDING KOLOKIUM LATIHAN PRAKTIKAL.
Quick Look
PROSIDING KOLOKIUM LATIHAN PRAKTIKAL.
Quick Look
WALL CONSTRUCTION /
Quick Look
QUALITY OF CONSTRUCTION /
Quick Look
WALL CONSTRUCTION /
Quick Look
SUBSTRUKTUR /
Quick Look
a CONSTRUCTION OF DOME /
Quick Look
CAPPING BEAM CONSTRUCTION /
Quick Look
WALL CONSTRUCTION: NON LOAD BEARING WALL /
Quick Look
Workshop on the Development of indigenous Training Materials for the trainers Paraprofessionals : Phase I 18-23 September 1978, phase II 8-9 November 1978
Load more items
View Record
Prev
Explore related channels
Next
Similar Items
METHOD STATEMENT FOR CONSTRUCTION OF TNB SUB-STATION /
by: Siti Zaharah Ramli, et al.
SUB-STRUCTURE CONSTRUCTION METHOD /
by: Farhanna Bahanuddin, et al.
THE CONSTRUCTION OF SUB-STRUCTURE /
by: Noor Hamizah Safie, et al.
COLD-FORMED STEEL TRUSS SYSTEM /
by: Mohamad Firdaus Mohd Nor, et al.
INSTALLATION OF NOVEC 1230 GASSEOUS FIRE SUPPRESSION SYSTEM /
by: Ahmad Alif Ahmad Shafiee, et al.