Skip to content
VuFind
登录
Theme
Bootstrap
Perak
语言
English
中文(简体)
اللغة العربية
தமிழ்
全文检索
题名
作者
主题
索引号
ISBN/ISSN
标签
检索
高级检索
Page will reload when a filter is removed.
Reset Filters
Applied Filters:
主题建议:
Remove Filter
Waste water
Page will reload when a filter is removed.
Reset Filters
Show filters (1)
主题建议:
Remove Filter
Waste water
KAEDAH PENANAMAN 'SPUN PILE' /
引用
发送短信
推荐此
打印
导出纪录
导出到 RefWorks
导出到 EndNoteWeb
导出到 EndNote
加到收藏夹
Permanent link
KAEDAH PENANAMAN 'SPUN PILE' /
Saved in:
书目详细资料
Main Authors:
Awatif Mohd Radzi
(Author)
,
Hasni Suryani Mat Hasan
(Author)
格式:
文件
语言:
马来语
主题:
Piling (Civil engineering)
>
Congresses
Piling (Civil engineering)
>
Design and construction
>
Congresses
Construction
>
Congresses
标签:
添加标签
没有标签, 成为第一个标记此记录!
持有资料
实物特征
您的评论
相似书籍
职员浏览
相似书籍: KAEDAH PENANAMAN 'SPUN PILE' /
Channel Options
View Record
探索相关频道
Quick Look
KAEDAH PENANAMAN CERUCUK GEREKAN /
Quick Look
PILING WORK AT THE CONSTRUCTION SITE /
Quick Look
KERJA-KERJA PENANAMAN CERUCUK /
Quick Look
PROSES PENANAMAN CERUCUK JENIS R.C /
Quick Look
PILING WORKS /
Quick Look
PERLANTAKAN CERUCUK KONKRIT BERTETULANG (R.C PILE0 UNTUK MASJID BATU 8, KUANTAN PAHANG /
Quick Look
BORED PILE CONSTRUCTION /
Quick Look
THE CONSTRUCTION OF PILE FOUNDATION /
Quick Look
KAEDAH PEMBINAAN STRUKTUR BANGUNAN BERASASKAN KONKRIT BERTETULANG /
Quick Look
CONSTRUCTION OF CAST IN SITU BORED PILE /
Quick Look
KERJA-KERJA SUB STRUKTUR DI DALAM PROJEK PERUMAHAN DI CAHAYA ALAM /
Quick Look
PEMBINAAN STRUKTUR-STRUKTUR BANGUNAN /
Quick Look
PELANTAKAN CERUCUK KONKRIT TETULANG /
Quick Look
BINAAN DI BAWAH PARAS PERMUKAAN TANAH /
Quick Look
PROSES PENANAMAN CERUCUK /
Quick Look
KAEDAH PEMBINAAN SUB STRUKTUR /
Quick Look
KAEDAH PEMBINAAN SUB-STRUKTUR BANGUNAN /
Quick Look
KERJA KONKRIT DI TAPAK BINA /
Quick Look
KAEDAH PEMBINAAN LANTAI DAN RASUK BANGUNAN /
Quick Look
KAEDAH PEMBINAAN TETOPI CERUCUK /
Quick Look
KAEDAH PEMBINAAN STRUKTUR ABNGUNAN BERASAKAN KONKRIT BERTETULANG /
Quick Look
PILE TEST /
Quick Look
HYDRAULIC JACK IN PILE-SISTEM CERUCUK MESRA ALAM DAN EFEKTIF /
Quick Look
PEMASANGAN KELULI TERBENTUK SEJUK SEBAGAI KEKUDA BUMBUNG /
Load more items
View Record
前一个
探索相关频道
下一个
相似书籍
KAEDAH PENANAMAN CERUCUK GEREKAN /
由: Nur Afiqah Zulkifli, et al.
PILING WORK AT THE CONSTRUCTION SITE /
由: Siti Norhafida Ramli, et al.
KERJA-KERJA PENANAMAN CERUCUK /
由: Norasmaaiadayu Mustafa, et al.
PROSES PENANAMAN CERUCUK JENIS R.C /
由: Mohd. Ikhwan Syafiq Abd. Aziz, et al.
PILING WORKS /
由: Mohd Faris Fikri Johari, et al.