Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing
Coiled Tubing (CT) services are extensively used in oil industry to clean out the fill produced from wellbore. Recently, the use of foam as cleaning agent has become more popular due to its low density and high viscosity which are desirable in many cleaning operations. The present study is carried o...
| Main Authors: | Khan, Javed A, Pao, William K. S. |
|---|---|
| Format: | Citation Index Journal |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.10941 / |
| Published: |
2013
|
| Subjects: | |
| Online Access: |
http://eprints.utp.edu.my/10941/1/v6-2655-2661.pdf http://eprints.utp.edu.my/10941/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| id |
utp-eprints.10941 |
|---|---|
| recordtype |
eprints |
| spelling |
utp-eprints.109412017-03-20T01:59:23Z Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing Khan, Javed A Pao, William K. S. TJ Mechanical engineering and machinery Coiled Tubing (CT) services are extensively used in oil industry to clean out the fill produced from wellbore. Recently, the use of foam as cleaning agent has become more popular due to its low density and high viscosity which are desirable in many cleaning operations. The present study is carried out to investigate the suspension of fines in the annulus of CT during cleaning operations. Solid particles were uniformly injected at annulus inlet and sand concentration at each point in the annular was calculated along the horizontal wellbore section. The motion of the particles is calculated under the effect of drag, buoyancy, rotational and virtual mass forces to analyze the settlement of the particles. The foam quality and foam velocity are found to be the deciding factors for the particle depositional pattern. The fill removal efficiency and frictional pressure loss are affected by both the velocity of the annular flow and the quality of the foam. 2013-08-10 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/10941/1/v6-2655-2661.pdf Khan, Javed A and Pao, William K. S. (2013) Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing. [Citation Index Journal] http://eprints.utp.edu.my/10941/ |
| institution |
Universiti Teknologi Petronas |
| collection |
UTP Institutional Repository |
| topic |
TJ Mechanical engineering and machinery |
| spellingShingle |
TJ Mechanical engineering and machinery Khan, Javed A Pao, William K. S. Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| description |
Coiled Tubing (CT) services are extensively used in oil industry to clean out the fill produced from wellbore. Recently, the use of foam as cleaning agent has become more popular due to its low density and high viscosity which are desirable in many cleaning operations. The present study is carried out to investigate the suspension of fines in the annulus of CT during cleaning operations. Solid particles were uniformly injected at annulus inlet and sand concentration at each point in the annular was calculated along the horizontal wellbore section. The motion of the particles is calculated under the effect of drag, buoyancy, rotational and virtual mass forces to analyze the settlement of the particles. The foam quality and foam velocity are found to be the deciding factors for the particle depositional pattern. The fill removal efficiency and frictional pressure loss are affected by both the velocity of the annular flow and the quality of the foam. |
| format |
Citation Index Journal |
| author |
Khan, Javed A Pao, William K. S. |
| author_sort |
Khan, Javed A |
| title |
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| title_short |
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| title_full |
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| title_fullStr |
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| title_full_unstemmed |
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing |
| title_sort |
fill removal with foam in horizontal well cleaning in coiled tubing |
| publishDate |
2013 |
| url |
http://eprints.utp.edu.my/10941/1/v6-2655-2661.pdf http://eprints.utp.edu.my/10941/ |
| _version_ |
1741196132350951424 |
| score |
11.62408 |