Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing
Coiled Tubing (CT) services are extensively used in oil industry to clean out the fill produced from wellbore. Recently, the use of foam as cleaning agent has become more popular due to its low density and high viscosity which are desirable in many cleaning operations. The present study is carried o...
Saved in:
| Main Authors: | Khan, Javed A, Pao, William K. S. |
|---|---|
| Format: | Citation Index Journal |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.10941 / |
| Published: |
2013
|
| Subjects: | |
| Online Access: |
http://eprints.utp.edu.my/10941/1/v6-2655-2661.pdf http://eprints.utp.edu.my/10941/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Horizontal Well Cleanup Operation using Foam in Different Coiled Tubing/Annulus Diameter Ratios
by: Khan, Javed, et al.
Published: (2013) -
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING
by: KHAN, JAVED AKBAR
Published: (2013) -
Effect of different qualities of foam on fill particle transport in horizontal well cleanup operation using coiled tubing
by: Khan, J.A., et al.
Published: (2014) -
Coupled thermo-hydro-mechanical model with consideration of
thermal-osmosis based on modified mixture theory
by: Chen, Xiaohui, et al.
Published: (2013) -
Heat Transfer Study of Helically Coiled Tube Heat Exchanger
by: Yusni, Alif Aiman
Published: (2016)