Framework for Effective Time Management Towards Safety Compliance in Construction Project
Construction delays can be identified as the timetable or contract schedule for the late completion of construction. In addition, construction industry is often known as one of the most dangerous. Not only do accidents result in major pain and suffering, they also marginalize efficiency, quality, ti...
Saved in:
| Main Author: | Azmi, Nurbazilah |
|---|---|
| Format: | Final Year Project |
| Language: | English |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-utpedia.20979 / |
| Published: |
Universiti Teknologi PETRONAS
2020
|
| Subjects: | |
| Online Access: |
http://utpedia.utp.edu.my/20979/1/CV2_23867_3SET_wordthesis.pdf http://utpedia.utp.edu.my/20979/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FRAMEWORK FOR EFFECTIVE SAFETY COMPLIANCE IN CONSTRUCTION PROJECTS
by: Perumal, Roshen
Published: (2020) -
FRAMEWORK FOR EFFECTIVE COST CONTROL FOR SAFETY COMPLIANCE IN CONSTRUCTION PROJECTS
by: ANUAR, MOHAMAD ARIF AIMAN
Published: (2020) -
Framework for Quality Management System for Safety Compliance Implementation in Construction Projects
by: Mohamad Faiz, Nuwairah Ilham Putri
Published: (2020) -
Framework for Effective Safety Management in Construction Projects
by: Mat Yaacob, Muhd Azmi
Published: (2016) -
Framework for Effectiveness Human Resource Management in Compliance of Safety in Construction Industry
by: Abd Rahim, Nur Ezzati Alya
Published: (2020)