PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
Traditionally the prediction of total project cost and schedule/time followed different methods. The former was based on the schedule of quantities and labors and the latter on quantity of work and productivity. The major deficiency of the methods was that the calculations were independent. Chang...
Saved in:
| Main Author: | PHUOR , TY |
|---|---|
| Format: | Thesis |
| Language: | English |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-utpedia.21182 / |
| Published: |
2014
|
| Subjects: | |
| Online Access: |
http://utpedia.utp.edu.my/21182/1/2014-CIVIL-PREDICTION%20OF%20THE%20TOTAL%20COST%20AND%20MONITORING%20AND%20CONTROL%20OF%20OFFSHORE%20PIPEWORK%20PROJECT%20USING%20THE%20INTERGRATED%20MATHEMATICAL%20MATRIX%20METHOD-PHUOR%20TY.pdf http://utpedia.utp.edu.my/21182/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
DEVELOPMENT AND APPLICATION OF THREE-DIMENSIONAL FINITE
ELEMENT INTERFACE MODEL FOR SOIL-JACK-UP INTERACTION DURING PRELOADING
by: TY, PHUOR
Published: (2020) -
Prediction of Pore water Pressure Responses to Rainfall Using Auto Regressive Integrated Moving Average Method (ARIMA)
by: SATHIVEL, SHALINI
Published: (2016) -
FRAMEWORK FOR EFFECTIVE COST CONTROL FOR SAFETY COMPLIANCE IN CONSTRUCTION PROJECTS
by: ANUAR, MOHAMAD ARIF AIMAN
Published: (2020) -
CRITICAL SUCCESS FACTORS AFFECTING QUALITY, COST
AND TIME CONTROL IN CONSTRUCTION PROJECTS
by: SAMSURI, AIN SYAFINAZ
Published: (2017) -
DEVELOPMENT OF ARTIFICIAL INTELLIGENT PREDICTION MODEL
FOR DELAYS AND COST OVERRUNS DURING THE CONSTRUCTION OF
PALM OIL REFINERY PROJECTS IN MALAYSIA
by: LIM ABDULLAH , MUHAMMAD SANI
Published: (2020)