Development of project cost contingency estimation model using risk analysis and fuzzy expert system
Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating proj...
Saved in:
| Main Authors: | Idrus, Arazi, Nuruddin, F, Rohman, M.Arif |
|---|---|
| Format: | Article |
| Institution: | Universiti Teknologi Petronas |
| Record Id / ISBN-0: | utp-eprints.3281 / |
| Published: |
Elsevier
2010
|
| Subjects: | |
| Online Access: |
http://eprints.utp.edu.my/3281/1/ESWA4955.pdf http://eprints.utp.edu.my/3281/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Expert's opinions on software project effective risk management
by: Janjua, U.I., et al.
Published: (2016) -
Improved project control for sustainable development of construction sector to reduce environment risks
by: Malik, S., et al.
Published: (2019) -
Improved project control for sustainable development of construction sector to reduce environment risks
by: Malik, S., et al.
Published: (2019) -
Effect of silica aerogel on the thermal conductivity of cement paste for the construction of concrete buildings in sustainable cities
by: Khamidi, M. Faris, et al.
Published: (2014) -
DEVELOPMENT OF RISK BASED DECISION MAKING
USING EXPERT OPINION FRAMEWORK FOR MOBILE
MOORING SYSTEM
by: SILVIANITA, SILVIANITA
Published: (2012)